This is the week for not much to be done other than watching concrete dry. At the end of the week a small crew of two waterproofed the basement outside walls on Thursday of all days. As there was not too much to be done on site it was a good week to line up some of the utilities so the house could have gas, power and the most important service of them all, the Internet.